1. Engineering Specification for Heat Exchanger
1.1 GENERAL
     ◐Two pass shell의 경우 Longitudinal baffle는 반드시 Welding할 것.
     ◐J or X type shell은 Condenser나 Reboiler의 경우만 Acceptable함.
     ◐Packed floating head or floating tube sheet joints(TEMA P or W)는 Not
     acceptable
     ◐Tube length : 6100 mm , 다른 tube length의 경우 Deviation작성 요
    ▣Gasket : 18-8 spiraI wound ( non-asbestos gasket)
    ▣Temperature :
     ◐18℃이상 운전되는 H/E : Design metal temperature는 Max. anticipated fluid temp 
     +28 또는 149℃ 중 큰 것으로 한다.
     ◐18℃이하 운전되는 H/E : 149℃ 및 Min anticipated fluid temp. -5℃가 되어야 한다.
    ▣Pressure : 다음 중 큰 것으로 한다.
     ◐Max. Operating Pressure + 10%
     ◐Max. Operating Pressure + 1.8 kg/cm2
     ◐Pump shut-off Pressure + 5%(exchanger outlet가 blocked될 수 있을 경우)
    ▣Vacuum service의 H/E
     ◐Internal pressure 1.8 kg/cm2 minimum
     ◐external pressure I.O5 kg/cm2
    ▣Corrosion allowance (Tube제외)
     ◐Carbon steel, low alloy pressure part  :   3.O mm
     ◐High alloy pressure part  : 1.5 mm

1.2  Steam surface condensers
    ◐Cleanliness factor는 85%
    ◐Multi stage ejector는 각기 Surface condenser설치할 것
    ◐각 ejector는 Full venting load로 설계할 것
    ◐Hydrazine으로 BFW를 처리할 경우 Surface condenser의 Air cooling region에 있는
      Tube는 ASME이어야한다.               

1.3 Shell, Channel, and Heads
    ◐Dished head는 2:1 ellipsoidal
    ◐Cladding,lining, or overlay의 Minimum thickness는 3 mm after machining
    ◐Liner는 Vent설치할 것 (Vacuum service 제외)
    ◐모든 fixed tube sheet exchanger에는 ShelI expansion을 설치한다.(severest조건으로
       design)
    ◐Expansion joint는 Bellows type이며 full design movement에서 1500 cycle로 Rating

1.4 Tubes, tube bundles, and tubesheet
   ▣Fouling factor는 TEMA recommendation을 따른다.
   ▣단 Cooling water는 0.0004 M2.Hr.℃/kcal로 한다.
   ▣Liquid velocity는 0.9 m/s 이상이어야하나 Admiralty tube에서는 2.3 m/s를 초과해서는
     안된다.
   ▣High alloy, non-ferrous(seamless or welded)의 Minimum tube size 및 gage는 19mm
      OD x 16 BWG임. 단 발주처가 Agree할 경우 16mm OD x 16 BWG 사용가능
   ▣Admiralty(seamless)의 Minimum tube size 및 gage는 19mm OD x 16 BWG임. 단
      발주처가 Agree할 경우 16mm OD x 16 BWG 사용가능
   ▣Carbon steel (seamless or welded)
     ◐Fixed tubesheet  : 19 mm OD x 14 BWG
     ◐Removable bundle : 25 mm OD x 14 BWG
   ▣Process fluid 와 섞여서는 안되거나 Process fluid에 의해 Tube collapse가 야기될
      가능성이 있는 경우 Welded tube to tubesheet joint로 할 것.
   ▣모든 Shell and Tube Exchanger에는 tube impingement protection을 설치할 것.
     ◐Increaser type nozzle은 unacceptable.
     ◐Perforated plate는 발주처의 approval 필요
   ▣Floating tubesheet와 Baffle 간격이 450 mm 이상일 경우 Support plate설치할 것
   ▣Complete drainage 설비를 갖출 것
     ◐Notch는 10 mm를 초과할 수 없다.
     ◐Pass partition은 6 mm hole을 만든다.
     ◐Steam이나 water가 shell에 Service될 경우 Vertical cut baffle을 사용할 것.
   ▣Carbon steel tubesheet는 특별한 규정이 없는 한 Admiralty tube와 함께 사용.
   ▣Austenitic stainless steel를 함유한 Molibdenum tube는 autogeneous longitudinal weld
      seam으로 사용불가
   ▣Baffle및 Support plate의 minimum thickness는 1O mm 임.
   ▣Cooling water side의 nozzle은 flat faced flange 사용
   ▣Blind flange는 NPS 3 이하 (for alloy or nonferrous )
   ▣Lining, cladding의 경우 NPS 4 이상 사용가능 (Metal temp.가 허용된다면)
   ▣2.0 kg/cm2.G 이하 Steam 또는 C.W service의 경우 NPS 3/4 class 6000 half
      coupling을 Vent,dtain용으로 설치할 것. 기타의 Vent, drain 은 NPS 1, flanged일 것    
   ▣Cooler와 condenser의 water side에는 2개의 NPS 1-1/2 chemical clean-out
      connection을 설치할 것
   ▣Steam surface condenser에는 Admiralty tube를 사용할 것 (Admiralty B,C,D)
     ◐이 때의 Tube sheet는 Naval brass, SB-171, Copper alloy UNS C46400
     ◐Admiralty tube의 Max. temp.는 232℃임.
   ▣Bellows type expansion joint는 Inconel 600이며 Shell에 water service의 경우
      Monel(Horizontal exch. only)사용
   ▣Process hydrocarbon에는 Copper나 Silver가 함유된 재질 사용 불가
   ▣Exchanger data sheet에 명기되어 있지 않을 경우 Baffle과 tie rod의 재질은 SS316
      이어야 함.
   ▣Hydrostatic test pressure : UG-99(b) of the code
   ▣Hydrostatic test
     ◐300계열의 Stainless steel에는 Chlorine content가 30 PPM이하의 물을 사용할 것.
     ◐불가할 경우 물을 sodium nitrat로 inhibited시킬 것.
     ◐이때 Inhibitor 주입량은 Chloride량과 PH에 의하여 정할 것(0.1% sodium nitrate로
     400ppm chloride, 8 PH cover)

2.CLARIFICATION ITEM / CHECK LIST FOR HEAT EXCHANGER
2.1  CODE
  ◈PRESSURE VESSEL SHALL BE DESIGNED IN ACCORDANCE WITH  "ASME
    Sec.Ⅷ Div.1  1995 ED.+ 1996 ADD.",LATEST EDITION.
  ◈"TEMA Std,class B, 7th ED. + up to 1991 ERRATA",LATEST ED.
  ◈"EJMA. 1993.6th.ED.+1994 ERRATA",LATEST EDITION.

2.2  MATERIAL
  ◈"ASME" or "ASTM" MATERIAL SHALL BE USED.
  ◈IF "JIS" MATERIAL WILL BE USED FOR NON-PRESSURE PART, THE
    APPLIED PART AND MATERIAL COMPARISON LIST SHALL BE SUBMITTED
    IN ACCORDANCE WITH "MATERIAL DEVIATION SHEET".

2.3  DETAIL DESIGN
  ◈FOR THE DETAIL DESIGN OF H/EX THE "SPEC. SUMMARY SHEET", SHALL
    BE APPLIED/ SHALL BE CONFIRMED IN ACCORDANCE WITH "PROJECT
    SPECIFICATION ".

2.4  SCOPE OF SUPPLY/WORK
  ◈THE SCOPE OF SUPPLY/WORK SHALL BE IN ACCORDANCE WITH
    "REQUISITION".
  ◈IF ANY DEVIATION, VENDOR SHALL CLEARLY SPECIFY IN " DEVIATION
     LIST".

2.5  SPARE PART
  ◈THE SPARE PART SHALL BE SUPPLIED IN ACCORDANCE WITH "AMOUNT
     OF SPARE PARTS".
  ◈SPARE PARTS FOR 1-YEAR OPERATION SHALL BE SEPARATELY QUOTED.

2.6  WELDING PROCESS
  ◈FOR WELDING PROCESS, FCAW(FLUX-CORED ARC WELDING) MAY BE
    USED onLY UPON THE REQUIREMENT OF "FCAW APPLICATION LIMIT".

2.7  SUB-VENDOR LIST
  ◈SUB-VENDOR LIST(GASKET etc.) SHAlL BE SUBMITTED FOR APPROVAL.

2.8  UNITS SYSTEM
  ◈ALL UNITS(SYMBOLS, DIMENSION etc.) SHALL BE IN ACCORDANCE WITH
    METRIC SYSTEM EXCEPT FLANGE RATING & PIPE SIZE. (COMPUTATIONS
    MAY BE IN THE UNITS OF CHOICE, BUT ALL INPUT DATA  AND RESULT
    MUST BE GIVEN IN THE METRIC SYSTEM.)

2.9  SPECIAL CONSIDERATION
  ◈THE FOLLOWING PARTS SHALL BE SPECIALLY CONSIDERED IN VENDOR'S
    QUOTATION.(REFER TO QUOTATION)

2.10  SUBMIT
  ◈VENDOR SHALL FILL-UP "QUOTATION SUMMARY SHEET" AND SHALL
    SUBMIT IT WITH QUOTATION. AND BREAKDOWN LIST SHALL BE
    SUBMITTED.

2.11  DEVIATIONS
  ◈DEVIATIONS FROM THIS REQUISITION SHALL BE CLEARLY LISTED IN
    "DEVIATION LIST".
  ◈UNLESS OTHERWISE SPECIFIED IN THE DEVIATION LIST,VENDOR MUST
    FULLY SATISFY ALL REQUIREMENTS OF DESIGN DATA SHEET,PROJECT
    SPECIFICATION AND SUPPLY/WORK SCOPE SPECIFIED IN THE REQUISITION. 
    
2.12  REQUIREMENTS
  ◈THE FOLLOWING PARTS SHALL BE SPECIALLY CONSIDERED IN VENDOR'S
    QUOTATION.(REFER TO QUOTATION)
  ◈VENDOR SHALL DESIGN THE DETAILED DEMENSIONS IN ACCORDANCE
    WITH "CODES"  AND ATTACHED "SHELL & TUBE TYPE HEAT EXCHANGER
    DESIGN GUIDE", AND MEET  THE GENERAL REQUIREMENT OF "JOB
    SPECIFICATIONS".
  ◈ALSO, VENDOR SHALL GAURANTEE THE STRENGTH OF EQUIPMENT.

3. SPEC' SUMMARY SHEET FOR SHELL & TUBE HEAT EXCHANGER
  *. The information given shall include but not be limited to the following.
3.1  WIND LOAD( P=cqA )
  ⑴WIND VELOCITY : 40 m/s
  ⑵DESIGN WIND PRESSURE(q)
     ◈H ≤ 16 M ----->  q = 50 
     ◈H  > 16 M ----->  q = 100      ( H : Meter  ,  q = ㎏/㎡ )
  ⑶AERODYNAMIC LOAD COEFFICIENT(c)
     REFER TO SPECIFICATION    
   ①SMOOTH SURFACE
     +.h/D = 1   →  0.5
     +.h/D = 7   →  0.6
     +.h/D = 25  →  0.7
   ②ROUGH SURFACE
     +.h/D = 1   →  0.7
     +.h/D = 7   →  0.8
     +.h/D = 25  →  0.9
     ※USE INTERPOLATION FOR OTHER h/D VALUES
  ⑷FOR PROJECTED AREA(A) CALCULATION,
     +.COEFFICIENT OF EFFECTIVE DIAMETER : 1.3 FOR ALL ITEMS

3.2  PRESSURE
  ◈FOR VACUUM SERVICE,EXTERNAL PRESSURE : 1.05 ㎏/㎠G
  ◈MINIMUM INTERNAL PRESSURE : 1.8 ㎏/㎠G

3.3  SEISMIC LOAD
  ◈SEISMIC FACTOR    K = 0.05 
  
3.4  ERECTION LOAD FACTOR
  ◈ERECTION LOAD FACTOR FOR ERECTION & HANDLING = 1.2

3.5  JOINT EFFICIENCY  
  ◈HEAD  : 1.0
  ◈SHELL : Min. 0.85(VENDOR MAY USE HIGH JOINT EFFICIENCY 
    CONSIDERING  ECONOMICAL DESIGN)

3.6  MATERIAL
  ◈SHELL/HEAD/EXTERNAL ATTACHMENT :AS PER "ENG'G DRAWING" OR
    "DATA SHEET"
  ◈INTERNAL WELDED ATTACHMENT AND SUPPORT --> THE SAME AS
    SHELL MATERIAL
  ◈MAXIMUM CARBON CONTENT OF STAINLESS STEEL SHALL BE O.O40 %

3.7  ALLOWABLE STRESS
  ◈BODY MATERIAL : AS PER CODE
  ◈HIGH ALLOY FLANGE : LOWER ALLOWABLE STRESS TO BE USED
  ◈ANCHOR BOLT : 1055 kg/㎠
  ◈ALLOWABLE BEARING PRESSURE : 40.8 kg/㎠ 
  ◈CONCRETE COMPRESSIVE STRESS : 280 kg/㎠  
   
3.8  MIN. THICKNESS OF H/EX
  ◈SHELL AND HEAD : ACCORDING TO TEMA TABLE CB-3.13
  ◈FOR ALLOY SHELLS,HEADS & CHANNELS,  CORROSION ALLOWANCE
    SHALL BE ADDED TO MIN.TH'K  LISTED IN TEMA TABLE CB-3.13    
  ◈MIN. THICKNESS OF LINING ,CLADDING or ALLOY WELD OVERLAY : 3 mm
  ◈MIN. THICKNESS OF SUPPORT : 6 mm (INCLUDING  C.A 1.5mm)
  ◈MIN.TUBESHEET TH'K : 38mm

3.9  CORROSION ALLOWANCE (EXCLUDE TUBE)
  ◈BODY  : AS PER "ENGINEERING DRAWING" OR "DATA SHEET"
     GENERAL : C.S(3mm) , SUS(1.5mm)
  ◈SADDLE, LUG : 1.5 mm(TOTAL) 
  ◈EXTERNAL ATTACHMENT : NONE
  ◈ANCHOR BOLT : 3 mm( dia.)
  ◈INTERNAL ATTACHMENT 
     +.NON-REMOVABLE PART : 3mm FOR EACH SURFACE OF INTERNALS (C.S)
     , 1.5mm FOR EACH SURFACE OF INTERNALS (S.S)
     +.REMOVABLE PART     : 1.5mm FOR EACH SURFACE OF INTERNALS (C.S)

3.10  NOZZLE
  ◈AS PER ENG'G DRAWING

3.11  MISCELLANEOUS
  ◈MINIMUM  DISTANCE  OF  STIFFENER  RING : 3600 mm
  ◈FIRE PROOFING
     +.AS PER ENG'G DRAWING
     +.MATERIAL DENSITY : 2400 kg/㎥
  ◈INSULATION
     +.THICKNESS : AS PER ENGINEERING DRAWING
     +.MATERIAL DENSITY : 100 kg/㎥
  ◈MISCELLANEOUS DESIGN LOAD : AS PER SPECIFICATION
  ◈MINIMUM THICKNESS OF PASS PARTITION : 10mm (GASKET CONTACT
    SURFACE)
  ◈MAXIMUM CARBON CONTENT OF STAINLESS STEEL WELDING RODE :
    0.04%
  ◈THE INTERNAL WELDS OF TYPE 317L SS EQUIPMENT SHALL BE
     OVERLAYED WITH TYPE 904L OR EQUAL ALLOY.
  ◈EXPANSION JOINT
     +.BELLOWS TYPE AND RATED FOR 1500 CYCLE
     +.MATERIAL:INCONEL 600 EXCEPT UNS 4400(MONEL) FOR HORIZONTAL
       EXCHANGER WITH WATER on THE SHELL SIDE.
     +.SHIPPING  BARS